Skip to content

Live updates connecting

Risk signals

Six signals computed directly from the submissions received. Each one shows the rule behind it, the counts it rests on, and quotes that can be followed back to the submission they came from.

No AI model is used here. The signals rest on counts alone and are not combined into a single risk score. Within a signal, ordering is by count alone.

The location is an indicative classification. The formal assessment of who is particularly affected is made by Trafikverket.

VolumeSignal 1 of 6

Volume among those likely affected

68 submissions in the underlying material

Which issues weigh heaviest among people living inside or close to the consultation area.

Quotes from Trafiksäkerhet och hastighet

  1. under hösten, vintern och tidiga våren är det i princip kolmörkt när ungarna ska dit och framför allt när de ska hem efteråt.

    Submission #70, resident inside the consultation area

  2. Vägen till affären, går där två gånger i veckan.

    Submission #71, resident inside the consultation area

  3. Trafiksäkerhetshöjande åtgärder som sänker hastigheten och dämpar bullret vid källan är givetvis också prioriterat.

    Submission #72, resident inside the consultation area

How this is calculated Volume among those likely affected

Those likely affected are submissions whose location is classified as inside or close to the consultation area. For each theme, the count is how many such submissions raise it. A submission counts once per theme however many comments it contains, so whoever writes the most cannot decide the order. Other comes last because it is a catch-all category rather than a theme. The quotes come from the theme at the top of the table and are chosen so that different stances are represented, not only the most critical one.

CategorySignal 2 of 6

Legally sensitive categories

51 submissions raise at least one of the categories

Three themes singled out in advance because they concern property, the environment and living conditions.

How this is calculated Legally sensitive categories

The categories are a fixed list: Intrång och fastighetspåverkan, Miljö och naturvärden, Buller. Each category is a theme from the theme assignment, and the figures are the number of submissions and comments placed there. The flag says the comment belongs to the category, not that it is legally sound. That assessment is made by Trafikverket. The quotes come from the category they sit under and are chosen so that different stances are represented, not only the most critical one.

IntensitySignal 3 of 6

Concentrated criticism by section

No section reaches the threshold for concentrated criticism

Sections where criticism is concentrated rather than evenly spread.

Critical comments per section

SectionCriticalCommentsShare
Tingvalla16133348 %
Valsta14431545 %
Western section9520546 %
Central Märsta6815244 %

No section reaches the threshold for concentrated criticism.

How this is calculated Concentrated criticism by section

A section is flagged when at least 50 % of the comments from it are critical and at least 25 critical comments have arrived. Both conditions must hold: the share alone would flag a section where three people have answered, and the count alone would flag the largest section in any consultation. Only submissions the register could place on a property are counted. The quotes are critical comments, because criticism is what the signal counts.

CoverageSignal 4 of 6

Silent areas

No section counts as silent

Sections few or none have answered from.

Response rate per section

SectionNotifiedAnswersShare
Western section711216 %
Central Märsta591016 %
Tingvalla1102018 %
Valsta981919 %

No section counts as silent.

How this is calculated Silent areas

A section counts as silent when at most 10 % of the properties notified there have answered. A section where none of the notified properties have answered always counts as silent. The figures come from the same coverage calculation the overview shows, so the two surfaces can never say different things about how many have answered.

UnansweredSignal 5 of 6

Unanswered questions

45 questions awaiting an answer

Questions the interviews could not answer and passed on.

The questions are answered in the consultation report. A question left unanswered there remains open when the consultation closes.

From 39 submissions4 questions were asked more than once

  1. Exakt hur nära hagen kommer den nya vägkanten och eventuell cykelbana att hamna, och vad händer med den gamla stenmuren – är den skyddad och får den stå kvar orörd?

    Submission #32asked 3 times

  2. Kommer bullerskärmen förbi min tomt eller slutar den vid grannen? Kan man få något slags löfte om att den faktiskt byggs på min sida också?

    Submission #69asked 2 times

  3. Hur länge kan en infart vara avstängd åt gången under bygget?

    Submission #54asked 2 times

How this is calculated Unanswered questions

The count is distinct questions. A question the same person asked several times in one interview counts once, in its fullest wording. Questions from different people are never merged: two people wanting to know the same thing are two people awaiting an answer.

AssuranceSignal 6 of 6

Requests for an assurance

10 submissions ask for an assurance

Comments and questions where someone explicitly asks for a promise or a guarantee.

These submissions expect a concrete answer. An assurance left out of the consultation report remains outstanding when the consultation closes.

14 matches in the text

  1. Jag vill ha svart på vitt hur fastighetsgränsen hanteras och en garanti för att häcken får stå kvar, alternativt att fullgott bullerskydd anläggs på Trafikverkets bekostnad.

    Submission #72, resident inside the consultation areaComment

  2. Kommer bullerskärmen förbi min tomt eller slutar den vid grannen? För jag vill verkligen ha ett löfte om att den byggs på min sida också, annars vet jag inte hur jag ska stå ut här på ålderns höst.

    Submission #69, resident inside the consultation areaComment

  3. Det absolut viktigaste är en garanti för att infarten hålls öppen och tillgänglig, särskilt under mina viktigaste affärstider.

    Submission #54, resident inside the consultation areaComment

Words in the list

WordSubmissions
garanti4
svart på vitt4
garantera3
löfte1
lova0
skriftligt besked0
kan ni lova0
How this is calculated Requests for an assurance

The text of comments and forwarded questions is compared against a fixed word list: löfte, lova, garanti, garantera, svart på vitt, skriftligt besked, kan ni lova. The comparison is on whole words, so ”garantiåtagande” does not count as ”garanti”, and upper or lower case makes no difference. The words are matched as written, without inflected forms. The list does not catch every way of asking for an assurance, and it does not decide whether the assurance can be given.